Manila Opens Its First Public EV Charging Station. Here Is What 30 kW Actually Gets You


The City of Manila has opened its first public EV charging station. It is small, with one fast charger and one AC charger. But it is a sign that local governments, not just malls and fuel brands, are starting to build public charging.

What opened, and where

Mayor Isko Moreno opened the station on 19 October 2026 at the Kartilya ng Katipunan, in partnership with ACMobility. According to Philstar, the site has:

  • One 30 kW DC fast charger
  • One 22 kW AC charger

The city plans two more stations before the end of the year, at Bagong Ospital ng Maynila and Sta. Ana Hospital. ACMobility says it runs more than 200 charging hub locations and 600 charge points nationwide. (Philstar, 20 October 2026)

The report did not include pricing. ACMobility’s NCR network rates, effective 16 October, are ₱31.00/kWh for AC and ₱37.50/kWh for DC (our breakdown here). The Manila site may or may not follow the same rate card.

What 30 kW and 22 kW actually mean

These numbers are easy to misread, so here is what they mean in practice.

The 30 kW DC charger is a fast charger, but at the lower end. Adding about 100 km of range (roughly 16 kWh for a typical EV) takes about half an hour, and longer as the battery fills up and charging slows. That is useful for a top-up while running errands nearby, not for a quick highway stop.

The 22 kW AC charger is limited by your car, not the station. Most EVs and PHEVs sold here accept 7 to 11 kW on AC. A car with a 7 kW onboard charger will charge at about 7 kW whatever the station is rated for. Check your car’s AC limit before you plan around this charger.

Why hospital sites make sense

The next two locations are a smart choice. Hospitals have people who park for hours: staff on long shifts, visitors and outpatients. That is exactly the situation where AC charging works well. It is the same idea behind good office and destination charging: put chargers where cars already park for a long time.

What this means for other LGUs and property owners

One station does not change Manila’s charging picture on its own. What matters is that a big city is now putting chargers on public property. Other LGUs, and owners of hospitals, schools, government offices and commercial buildings, should take note, especially with the DOE pushing for charging in parking areas (see our explainer on the DOE’s 5% parking rule).

Some lessons from the Manila model:

  • Pair DC and AC. One fast charger for quick turnover, AC for long stays. It is a sensible starting point for most sites.
  • Pick sites where people stay. Dwell time matters more than foot traffic.
  • Check electrical capacity first. A 30 kW DC charger needs a supply that many older buildings do not have. A site assessment comes before choosing hardware.

Related guides

Talk to us

MOEV Solutions Inc. is a DOE-accredited (National Level, cert DOE-EUMB-ANA-20250708001) EV charging supply, installation and maintenance company based in Quezon City. If you manage a property, campus or LGU facility and want to know what charging would cost there, get a figure from our instant quote tool or message us on WhatsApp at 0993 158 1936.

Sources

  • “Manila opens EV charging station,” Philstar, 20 October 2026 — philstar.com
  • “Public EV Charging Rates Change on October 16,” MOEV Solutions, 14 October 2026 — moev.ph

Want a quote for your own home?

Five quick questions and we will send you a written quote — usually within one working day.

Get my free quote →